
Recent Job News
Sudbury Inco Project - Thickener
Category: Recent Jobs
Posted by: labbetts on
The job included for the completed installation of 400 ton of structural steel support frame installed prior to the erection of the tank and mechanical portion. The job was the #5 Waste Water Thickener Project at Inco. The client supplied his own material in which Quality Tank completed the erection of the components on site in a 13 week construction window. The tank diameter was 100' X 16' high.